CALL US
+966 12 669 6565
WORKING HOURS
Sat–Wed 8:30am – 6pm - Thurs. 8:30am – 2pm

Category: Recent Projects

CONSTRUCTION OF AUXILLARY BUILDINGS AND OTHER FACILITIES

The project scope is the procurement and construction of laboratory building, warehouse, workshop, fire station, control rooms, administration building, canteen, clinic, mosque, u/g tanks with pump rooms, generator room/electrical room, transformer enclosure, site infrastructures, landscaping and irrigation system, hardscaping, asphalt roads/parking, street lighting and weighbridge….

CONSTRUCTION OF NEW COMPONENTS FACTORY

The project scope is the procurement and construction of the main warehouse building, administration block, pump rooms, guard house, reservoir pump room, office room including demolition of existing structures, new boundary fence and gates, concrete roads, hardscaping, landscaping, underground tanks, silos foundations and dock leveler….

CONSTRUCTION OF DOKA INDUSTRIAL FACILITIES

The project scope is the procurement and construction of a main warehouse + showroom building, pre-assembly building with foremen’s office, administration building, consignment building, fire station cabin, guard houses, pump rooms and substation/ generator room including asphalt roads/parking, hardscaping, landscaping with irrigation system, site infrastructures,…

CUT & BEND STEEL REINFORCEMENT FACTORY

This cut and bend steel factory is a satellite to Jizan South Steel Factory. It is a unique project due to the extensive and specialized MEP works it contains, such as cold water chiller system, compressor system and ventilation system in addition to nine overhead…

PROPOSED SHOPS, WAREHOUSES AND OPEN YARDS

This development is one of many investment projects by Liberty Investments Company and composes of two Buildings, three Open Yards and a Service Block. One of the buildings is divided into 20 shops and the other Building is divided into 30 Warehouses. For each shop…

AL QIYADAH MIXED USED DEVELOPMENT

The development is a mid-rise building of 2B+G+M+4 Typical floors consisting of Shopping mall + 3 Star Hotel (223 Nos) + Hotel Apartment “Superior class” (88 Nos), with two basement floors of parking. The shell and core of the structure is fully concrete. Client : Al…

HYPER MARKET

The development is a Pre-Engineered Steel Structure that comprises of a Hyper Market + Offices + Fast Food Shops & Food Court + Mix Use shops. Services include Toilets and Pantry for the staff as well as Public Toilets for the customers. Client : Mr. Rashad…

PROPOSED WAREHOUSE + MEZZANINE

This building structure is Pre-Engineered Steel and is divided into 8 Major warehouses, each with their own office and toilet. The mezzanine floor is a decking slab that covers almost 50% of the ground built-up area. Client : Mr. Abdul Majid Salem Abo Bakr. Consultant : M/s…

WordPress Theme built by Shufflehound. COPYRIGHT © 2018 ASIA GENERAL CONTRACTING COMPANY. ALL RIGHTS RESERVED. DESIGNED BY: VUDU ADVERTISING